Each Industrial User must notify the Director of any significant changes to the Industrial User’s operations or system which might alter the nature, quality, or volume of its wastewater including facility closure at least 30 days before the change.

A. The Director may require the Industrial User to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under MMC 13.05.240.

B. The Director may issue an industrial wastewater discharge permit under MMC 13.05.360 or modify an existing wastewater discharge permit under MMC 13.05.330 in response to changed conditions or anticipated changed conditions. (Ord. 4987, 2015).