Skip to main content
Loading…
Proof
Pretreatment of Wastewater
This article is included in your selections.
This section is included in your selections.

Industrial Users shall provide wastewater treatment as necessary to comply with this ordinance and shall achieve compliance with all Categorical Pretreatment Standards, Local Limits, and the prohibitions set out in MMC 13.05.010 within the time limitations specified by EPA, the state, or the Director, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the Industrial User’s expense. Detailed plans describing such facilities and operating procedures shall be submitted to the Director for review, and shall be acceptable to the Director before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the Industrial User from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the city under the provisions of this ordinance. (Ord. 4987, 2015).