Skip to main content
Loading…
Proof
This section is included in your selections.

Projects shall be defined by the Director and will include those located in basins of the sanitary sewer system as identified by the city’s adopted Conveyance System plan as high flow basins, and such other areas as the Director may designate or by inclusion within the city’s Capital Improvement plan for system repair and/or replacement projects to reduce inflow and infiltration. (Ord. 4987, 2015).