Skip to main content
Loading…
Proof
Location of Telecommunications Facilities
This article is included in your selections.
This section is included in your selections.

All facilities located within the public right-of-way shall be constructed, installed, and located in accordance with the following terms and condition, unless otherwise specified in a franchise agreement:

A. Whenever all existing electric utilities, cable facilities, or telecommunications facilities are located underground within a public right-of-way of the city, a grantee with permission to occupy the same public right-of-way must also locate its telecommunications facilities underground.

B. Whenever all new or existing electric utilities, cable facilities, or telecommunications facilities are located or relocated underground within a public right-of-way of the city, a grantee that currently occupies the same public right-of-way shall relocate its facilities underground concurrently with the other affected utilities to minimize disruption of the public right-of-way, absent extraordinary circumstances or undue hardship as determined by the city and consistent with applicable state and federal law. (Ord. 4734 §1, 2000).