Skip to main content
Loading…
Proof
This section is included in your selections.

A. All wastewater discharge permit applications, Industrial User reports and certification statements must be signed by an authorized representative of the Industrial User and contain the certification statement in MMC 13.05.494(A).

B. If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the Director prior to or together with any reports to be signed by an authorized representative. (Ord. 4987, 2015).